Exeter Battery Energy Storage System

EDF

Exeter

Sustainable Drainage Systems
Flood Risk Assessment

Optimising Battery Energy Storage Systems (BESS)

Raincloud was appointed to provide the SuDS design and Flood Risk Assessment in support of a 57MW Battery Energy Storage System (BESS) adjacent to the Exeter Substation.

Raincloud designed the SuDS network to allow for the full containment of fire suppressant in accordance with the National Fire Chiefs Council guidance on BESS.

The LLFA reviewed the SuDS design and offered no objection to the Development, which was granted consent by East Devon District Council in July 2025.